- Overview
- Product Description
- Detailed Photos
- Product Parameters
- Certifications
- Packaging & Shipping
- Company Profile
- FAQ
Basic Info.
Product Description
24h technical and business service
30+ years experience in powder coating industry
200+ professional technicians, engineers and workers
300+ projects in China and around the world
To bring a customized SUCCESSFUL project for you!

After getting the required parameters of your ideal plant, the professional project group will analyze your situation meticulously, after which we will supply you a detailed scheme and drawing for your requirements in 24h.
The integrated design and manufacturing ensure the coming system running smoothly and stably.
We are not only equipment designer and manufacturer, also we have the top R&D team to design the pretreatment section.
The R&D team will design the formula and process flow of the pretreatment section for the workpiece according to your situation and requirements, which will guarantee the finished surface a long service and best quality.


No matter the dimension, weight, shape of the workpiece you want to paint, we can design the hanger system with the high efficiency-save your space, upgrade your output.
Certainly, the designed hanger for your workpiece is available here. We can manufacture the hanger for you.
PLC controlled automatic powder coating machine is equipped for all the projects, which will largely save your labor and ensure the powder coating quality.
The recovery system of the powder are 2-step pattern. The powder utilization rate can reach 99.2%.


The patented quick color change structure of the powder supply center makes it possible that you can change the painting color in only 20 minutes.
It will be much convenient when it comes to powder coating different workpiece in one production line.
The Standard Process Situation of the Powder Coating Line
Process | Parameter | Mode | Remark | |
Temperature | Time | |||
Loading | RT | |||
Pretreatment | 35-50ºC | 15-20min | Automatic | Adjustable |
Drying | 100-120ºC | 15-20min | Automatic | Adjustable |
Cooling | RT | 5-10min | ||
Powder Coating | RT | 3-5min | Automatic and Manual | Adjustable |
Curing | 200-220ºC | 30-35min | Automatic | Adjustable |
Cooling | RT | 10-15min | ||
Unloading | RT |


Are you a trader or a factory?
We are manufacturer and exporter.
Our own factory was found in 1995,Our export office was established in 2014.
What should I provide if interested in your powder coating equipment ?
A. The material/size(max)/weight(max)of your workpiece.
B. How many of your daily output(one day=8hours,one month=30days)?
C. What heating power do you prefer: electric, gas, diesel or coal?
D. The size of your factory(length, width and height)?
How to install equipment after purchasing your equipment?
A. We will provide installation information and installation videos
B. Our engineers will guide the installation and run the equipment.
C. After the debugging, will provide complete training and track customer device usage.
What's your production cycle like?
Because our company is doing non-standard custom coating production line, in order to ensure the quality of the product, the production cycle of the order equipment is 60 working days, and the actual situation needs to be arranged according to the company's recent order volume.
How is your company's after-sales service done?
A. Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B. After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C. If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D. Any problems with the equipment, our company guarantees to give solutions within 12 hours.