Basic Info.
Driven Type
Electric
Automatic Grade
Automatic
Plastic Film Mulching Modes
Hot Laminating
Performance
Waterproof
Condition
New
Power of Extruder Motor(Kw)
18.5
Weight
5500kg
Number of Die
2
Dimension(L*W*H)
1300*800*250mm
Warranty of Core Components
1 Year
Voltage
220/380V
Width of Die
1000
Marketing Type
Hot Product 2019
Heating Power of Extruder(Kw)
32
Video Outgoing-Inspection
Provided
Core Components
PLC, Bearing, Motor, Gear
Total Power(Kw)
60
Power of Driving Motor(Kw)
7.5
Showroom Location
None
Transport Package
Wooden
Trademark
ZD
Origin
Zhejiang, China
Production Capacity
10 Set/Sets Per Month
Product Description
Product Description
Performance and Characteristic:
This Non woven fabric laminating machine making use of the good adhesive property of polypropylene & polyethylene at meltingstatus . the machine adheres and laminates paper or color-printed OPP & CPP film to Nonwoven fabric , The extruder with helical gear reducerf 20crmn Tialloy steel adopts automatic temperature-control system to ad just melting temperature , the screw and cylinderare made of 38CRMOALA alloy steel and donetreatment of nitrogenation . The double-die cando single or double-face coating , width of coating laminating can be regulated , andcontrol coating thickness and laminating speed , automaticall Automatic edge cutting , edge-blowing , cutting-off and winding devices are applied.

Type | Diameter of extruder screw | L/D ratio of screw | Number of Die | Width of Die | Total power(kw) |
ZD-FMF105/1000 | 105 | 28:01:00 | 2 | 1000 | 60 |
ZD-FMF105/1200 | 105 | 28:01:00 | 1/2 | 1200 | 90 |
ZD-FMF105/1600 | 120 | 28:01:00 | 1 | 1600 | 120 |
Type | Power of extruder motor(kw) | Heating power of extruder(kw) | Power of driving motor(kw) | Installing Dimensions(mm)L*W*H | Weight(approx)(kg) |
ZD-FMF105/1000 | 18.5 | 32 | 7.5 | 1300*800*250 | 5500 |
ZD-FMF105/1200 | 18.5 | 35 | 7.5 | 1300*8800*250 | 6000 |
ZD-FMF105/1600 | 22.5 | 38 | 7.5 | 1300*1100*250 | 7000 |
Main Products
Company Information



Shipping & Packaging

FAQ
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor
etc.Prepared)
2. How many days will you finish installing ?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
6. How could you do after one year warranty period?
We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor
etc.Prepared)
2. How many days will you finish installing ?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
6. How could you do after one year warranty period?
We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Contact Us
